Roll-on Roll-off cargo ferry Norstream underwent large-scale upper deck reinstatement using SPS in 2024 at Denmark’s Fayard shipyard following the successful deck reinstatement of her sister ship Norsky.

SPS Technology partner SRC successfully led a team that installed 2498m² [26,877 ft²] of Sandwich Plate System as part of the upper deck reinstatement of the freight ferry Norstream. A RoRo cargo ferry built in 1999, Norstream serves the twice-daily shipping route between Tilbury and Zeebrugge along with Norsky.

With a firm commitment to ensuring the Norstream was back in service as quickly as possible, the combined SRC and SPST team worked together 24/7 over 19 days with elastomer injections across 190 cavities taking place during the last 11 days of the project. This approach:

  • Reduced operational downtime, thanks to the rapid and efficient SPS installation process.
  • Improved structural performance and increased deck longevity.
  • Lowered environmental impact, due to reduced steel replacement and waste.
  • Minimised disruption to operations, with key activities carried out while the vessel was underway.

 

The team even injected the elastomer core of the deck reinstatement as the ship sailed. Exceptional project management was a necessity. Pre-project preparation and coordination included well-structured pre-meeting discussions, mitigating potential challenges during execution and the SRC project management team was commended for its professionalism and efficiency across both projects.

Bore expressed strong satisfaction with both projects, emphasising the team’s dedication, problem-solving abilities, and 24/7 work ethic across both cargo deck reinstatements:

"SRC Group delivered an outstanding SPS solution for our Ro-Ro deck repairs on the Norsky and Norstream. The SRC team-maintained commitment to quality and efficiency. Their professionalism, expertise, and ability to work around the clock made a significant impact on project success. The SRC team not only provided a first-class SPS repair solution but also demonstrated adaptability and continuous improvement in how they managed arising challenges. We were particularly impressed with the project management team’s approach.
For any Ro-Ro operators seeking a durable, high-quality, and efficiently executed deck repair solution, an SPS repair with SRC Group should be the first choice."

Daniel ErikssonTechnical Superintendent, Bore Ltd.

SPS: a reliable and results-driven solution for upper deck reinstatement

Despite the complexities involved, Bore was highly satisfied with the quality and precision of the SPS repair execution.

Have a look at our Network Partner SRC’s video showing the large-scale deck reinstatement of Norstream’s sister ship Norsky below: