USTA National Tennis Center Court 17

 

Project Type

Outdoor stadium

Location

Flushing Meadows, New York, US

Date

2011 & 2026

Team

ROSSETTI (now HOK+ROSSETTI)
WSP Global (NY)
Walters Group
Southern Bleacher Company Inc.

©SPS Technology, Spexer99/ WikiCommons

USTA Logo

The USTA has relied on the SPS Stadia+Arenas System at its courts since 2011, when it first chose SPS for Stadium 17, the fan favorite known as ‘the Pit.’

Fifteen years later, the USTA invited SPST back to carry out maintenance, to ensure the Pit delivers for years to come.

Court 17’s story began when USTA planners fused two outer courts into a single, larger stadium at the Billie Jean King National Tennis Center. But when excavation crews hit a high water table and concrete rubble from previous World’s Fairs, the design needed a rethink.

Embracing the challenge, the design team sank the court about eight feet below grade, creating a subterranean stadium. That, along with its steep, close-up seating would soon define the court.

Very quickly, fans nicknamed it “the Pit.”

To meet an aggressive construction schedule, the design team specified the SPS Stadia+Arena System for the tiered decking for 2,200 of the 2,500 spectator seats. In total, Court 17 uses 14,100 ft² [1,310 m²] of SPS.

Those unexpected soil conditions gave the USTA grounds their most electric, unpretentious place to watch tennis.

Now, maintenance of the SPS stadia decking will keep the Pit supporting fans through many more tournaments to come.

Fast forward 15 years

By conservative estimates, Court 17 has drawn well over a million boisterous fans, since its construction. Add in New York’s harsh winters and brutal summers, and the SPS stadia decking needed a refresh.

What truly sets the SPS Stadia+Arenas System apart is its longevity: with proper maintenance, skilled crews can restore it to near-new condition even after years of heavy use. That durability is exactly why the USTA chose SPS again for the Grandstand Stadium.

In advance of the 2026 US Open, the SPS Technology team were contracted to:

  • Install new caulked joints​
  • Repair caulking and rusting on aisle steps
  • Replace nosings and cover plates throughout
  • Repaint all topside SPS surfaces, including non-slip grit

 

Check out some photographs of the successful refurbishment below.

Or reach out to our team if you’d like to find out more about maintenance for your SPS venue!

  • Previous ProjectLondon 2012 Olympics Aquatics Centre Demountable Seating

  • Next Projectbp pulse LIVE at NEC Birmingham