Atlantic Sovereign

 

Project Type

Main Deck Repair with SPS

Location

A&P Tyne, UK

Date

July 2024

Team

STS Marine Solutions
Atlantic Oceanic
Marine Offshore Management

©Marine Offshore Management, SPST 

Marine Offshore Management successfully delivered a main deck repair using Sandwich Plate System, SPS, on the Atlantic Sovereign, an offshore supply vessel supporting energy operations in the North Sea. The main deck required structural reinstatement and SPS was selected as the optimal solution to ensure minimal downtime and maximum durability.

Project Highlights
  • Installed Area: 142 m² [1528 ft²] of SPS 8-20-Existing and 10-20-E (iwo the aft A-frame area)
  • Duration: July 10–18, 2024
  • Injection Points: 26 SPS cavities
  • Completion: On time
  • Class Approval: Lloyd’s Register.

 

Benefits Delivered
  • Reduced Downtime: The main deck reinstatement was completed while maintaining the vessel’s operational schedule
  • Extended Lifespan: Main deck repair with SPS restores and protects structural integrity
  • Class Compliance: All work carried out to Class-approved procedures
  • Efficient Installation: All work is performed from the main deck using standard shipyard welding techniques.

Marine Offshore Management (MOM) delivered an exceptional SPS repair on the main deck of the Atlantic Sovereign, reinstating the deck plating with efficiency and precision. Their expertise in SPS allowed us to avoid traditional ‘crop-and-replace’ methods, significantly reducing downtime and keeping our vessel on schedule. The MOM team was professional, knowledgeable, and committed to delivering a high-quality, long-term solution that enhances the structural integrity of our deck. We are extremely pleased with the outcome and look forward to working with them again in the future.

Atlantic Oceanic

Class-approved Main Deck Repair using SPS

The reinstated deck is now stronger, more durable, and fully compliant with Lloyd’s Register standards. By choosing Sandwich Plate System and partnering with MOM, Atlantic Oceanic ensured their asset remained in active service with a long-lasting structural upgrade, completed efficiently and to the highest technical standards.